2014 TRB Subcommittee Meeting:  
 Meeting Minutes
       Meeting Materials -

       TRB Structures Committees - Compiled RNS

       2014 AASHTO SCOBS Strategic Plan - Final Report

          Note: Prioritized Objective No. 5 is "Accelerate Bridge Delivery and Construction"

       SHRP2 R04 - project update

       SHRP2 overview article  

         Moving Research Results into Implementation by Kirk Steudle/MiDOT

       2014 National ABC Conference - call for abstracts

Paper Session No. 344:

  14-2476: A Decision Support Framework for ABC
                   Baris Salman, Middle East Technical University
  14-3602: Design of UHPC Waffle Deck for ABC
                  UHPC Waffle Deck Design Guidelines
                  Sri Sritharan, Iowa State University
  14-5190: Concrete Filled Tubes for ABC 
                  Dawn Lehmam, University of Washington
 14-7062: Precast Paving Notch System for Accelerated Bridge Repair (not published)
                 Brent Matthew Phares, Iowa State University


Workshop No. 183:


 Agency implementation of ABC in a programmatic manner    
     Wayne Symonds, PE
     Design Build Program Manager, Vermont DOT
 Full Depth Deck Panels w/ UHPC – an agency’s collaborative efforts with industry to advance and implement prefabricated deck panels using Ultra High Performance Concrete for a program of projects  
     Richard Marchione, PE
     Chief Engineer Structures, New York DOT
 Massena Lateral Slide Bridge Project – an Owner’s experience on the use of the lateral slide method for ABC applications
     Ahmad Abu Hawash, PE 
     Chief Structural Engineer, Iowa DOT
 Rawson bridge move using Self Propelled Modular Transporters – an Owner’s experience on the use of SPMT’s for ABC applications
     William Oliva, PE
     Design Chief, Wisconsin DOT
 Alteration of Bridges Projects - challenges and unusual construction techniques to replace moveable bridge spans using ABC methods    
     Kamal Elnahal, Ph.d; PE
     Chief Engineer/U.S.C.G
     Arvind Patel, PE; PMP
     Structures Project Manager Office of Bridge Programs/U.S.C.G